News

Beata

Corporate NewsIndustry InformationOffline Exhibition

Comprehensive mastery of floor laying technology: a professional guide from material selection to construction steps

In today's construction field, floor laying technology has become extremely important.

 Whether it is home renovation, commercial area development, or the beautification of public spaces, floor laying plays a crucial role.

 This article aims to provide you with a comprehensive guide on floor installation, covering every aspect from material selection to construction steps.

Selection of floor laying materials

There are many kinds of materials laid on the ground, different materials not only affect the beauty of the ground, but also involve cost, durability and maintenance. 

 Common materials laid on the ground include but are not limited to tiles, natural stone, concrete, wood, plastic composite materials, etc.

1. Porcelain tiles: widely used in kitchen, bathroom and other areas, because of their good water resistance and wear resistance, they are popular.

2. Natural stone: such as marble, granite, etc., are often used to create luxurious visual effects, but are expensive and require regular maintenance.

3. Concrete: Often used in outdoor or industrial style interior design, it is durable and easy to maintain, and can also be beautified with various coatings and colorants.

4. Wood: Provides a natural warm feeling and is suitable for home environments, but requires moisture protection and regular waxing maintenance.

5. Plastic composite materials: such as plastic floor, which has the characteristics of water and insect protection, suitable for outdoor or humid environment.

Second, the preparation work of ground laying

Before laying the floor, appropriate preparation must be carried out to ensure the quality of laying and prolong the service life.

1. Measurement and design: Measure the size of the area to be laid accurately and design the arrangement according to the function of the room and the expected visual effect.

2. Ground treatment: Ensure that the laying area is flat and clean, and sand or level it if necessary.

3. Material preparation: According to the design requirements, floor materials are pre-cut and adjusted.

Detailed construction steps

Construction is the most critical part of floor laying. 

The correct construction method not only relates to the appearance of the floor, but also directly affects the safety and comfort of use.

1. Lay the base layer: according to the different materials, lay the appropriate base layer materials first, such as waterproof layer, sound insulation layer, etc.

2. Floor material laying: Strictly lay according to the pre-designed drawings, pay attention to the material connection and edge treatment.

3. Filling and adjustment: Use appropriate filler to fill the joints, ensure that there is no gap between the floors, and the overall effect is flat and beautiful.

4. Clean up and inspect: After all the laying is completed, clean up the site and conduct a detailed inspection to ensure there are no omissions or defects.

Maintenance after floor laying

After the ground is laid, proper maintenance is the key to ensure the beauty of the ground and prolong the service life.

1. Regular cleaning: Choose appropriate cleaning methods and cleaning agents according to the characteristics of the material, and avoid using chemicals that can damage the floor.

2. Timely repair: the damaged floor should be repaired in time to prevent the damage from expanding and affecting the use.

3. Use protective measures: Use protective pads at the bottom of the furniture to avoid direct friction against the floor.

sum up

The ground laying work may seem simple but actually involves multiple complex steps and key points.

From material selection to every step of construction, meticulous planning and attention to detail are required.

Through this article's introduction, it is hoped that you will gain a better understanding of the entire process of ground laying and achieve success in future projects.

Return
Contact Us

Office Address:Room 1705-2, No. 492, Xinglinwan Road, Xinglin Street, Xiamen, Fujian, China

Factory Address:1 Floor No.123 Yulin Road, Qiekeng Village, Neikeng town, Jinjiang city, Quanzhou city, Fujian province, China

Mobile phone:+86 181 5009 9653

Fax/Tel:(+86)0595-8682 8385

Email: director@beata-stone.com

Copyright (C) 2023, Beata Ceramics Co., Ltd. All Rights Reserved.Supported by Copyright Notice

Need Help? Chat with us

Start a Conversation

Hi! Click one of our member below to chat on

Send A Message
Send A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.